1. Home
  2. Blog
  3. Jaw Crusher

Open pit mining

Open pit mining

The method selected for the DSO Project is conventional open-pit with a front-end loader/truck operation. The rock will be drilled, blasted and loaded into haul trucks that will deliver ROM to the primary mineral sizer, located at the Timmins Site. From each pit, waste will be hauled to an out-of-pit waste dump to be located

Get Price List Chat Online

Product

Hot Product

Message Online Chat